Underpassing an island

Underpassing an island

A large amount of our offshore grid connection systems in the western North Sea currently run across the island of Norderney. The main reason for crossing the island is the strong tidal currents. These have such a strong effect on the seabed between the East Frisian islands that it is technically impossible to lay the cable safely around the island.
TenneT has bundled these grid connections in a joint conduit structure under the island. Further offshore grid connections are being constructed using horizontal drilling from the center of Norderney towards the south and north. The flyer explains how the drilling works in detail. In the future, the islands of Baltrum and Langeoog will also be used to cross offshore grid connections.
20200805 BorWin5 HDD Norderney (4)

An example: Underpassing the island of Baltrum

The island of Baltrum and the landing area near Dornumergrode are underpassed by our BalWin3+4 and LanWin1+4+5 projects. Specifically, the submarine cables for the projects run under Baltrum to the landing point at Dornumergrode and connect the converter platforms at sea with the converter stations on land. Horizontal directional drilling (HDD) is used to cross the island of Baltrum and the Lower Saxony coastal protection dike near Dornumergrode. This method allows for trenchless installation, minimizes surface disruption, and thus protects the sensitive natural environment in the Lower Saxony Wadden Sea National Park. In addition, when carrying out work in the Wadden Sea, we strictly adhere to the construction time frames mandated by nature conservation and dike regulations.

Informationhttps://tennet-steckbriefe.webmag.io/steckbriefe-1/offshore/baltrum